Vetschau

Number WEC
1 unit
Manufacturer
Vestas V90
Power / WEC
2 MW
Total Power
2 MW
Hub height
125m
Type of tower
steel concrete fundament
German Federal Land
Brandenburg
Vetschau
click here to open gallery
Characteristics / Variation to standard:
  • The installation surface has a size of approximately 1,250 .
  • The access road to the turbine is created as a gravel path with a width of 4m (approx. 1,500 m²).
  • The wind turbine primarily is for self-sufficiency of existing operating systems for pig breeding and fattening with electric energy (self-sufficiency system).